logo

Mumbai-Ahmedabad Bullet Train

Sector: Mass Transit • Location: Mumbai, Ahmedabad, Maharashtra, Gujarat, Dadra & Nagar Haveli, India

Source: The Economic Times

Project
Planned

India's first high-speed rail project, the Mumbai-Ahmedabad Bullet Train, will introduce Japanese Shinkansen technology to India's railway network, significantly reducing travel time between Mumbai and Ahmedabad. The 508 km corridor includes key stations such as Mumbai (BKC), Thane, Virar, Boisar, Vapi, Bilimora, Surat, Bharuch, Vadodara, Anand, Ahmedabad, and Sabarmati, passing through Maharashtr

Project Information FAQ

Project Information

3 Q
The project “Mumbai-Ahmedabad Bullet Train” is an infrastructure initiative in the Mass Transit sector, located in Mumbai, Ahmedabad, Maharashtra, Gujarat, Dadra & Nagar Haveli, India. Taiyo aggregates data on it from The Economic Times.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

planned

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

India's first high-speed rail project, the Mumbai-Ahmedabad Bullet Train, will introduce Japanese Shinkansen technology to India's railway network, significantly reducing travel time between Mumbai and Ahmedabad. The 508 km corridor includes key stations such as Mumbai (BKC), Thane, Virar, Boisar, Vapi, Bilimora, Surat, Bharuch, Vadodara, Anand, Ahmedabad, and Sabarmati, passing through Maharashtra, Gujarat, and Dadra & Nagar Haveli. The project is supported by Japan's Shinkansen system, known for its safety, punctuality, earthquake resistance, and advanced signaling. Japan is providing major financial and technical assistance. The train will operate at speeds of around 300-320 kmph, reducing the journey time to about two hours compared to nearly six hours by existing trains.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data