logo

Mumbai-Ahmedabad High Speed Rail Project

Sector: Mass Transit • Location: India

Source: The Indian Express

Project
Under Construction

The Mumbai-Ahmedabad High Speed Rail (MAHSR) project involves the construction of a bullet train line between Mumbai and Ahmedabad. The first 50-km section (Surat-Bilimora) will be operational with an India-made bullet train set (B28) designed for speeds up to 280 kmph. The project includes deployment of the European Train Control System (ETCS) Level 2-based signalling system, scheduled to be oper

Status
Under Construction
Sector
Mass Transit, Rail, Government
Location
India
Updated
22 Jul 2026
Source
The Indian Express

ConstructChat

Ask ConstructChat about Mumbai-Ahmedabad High Speed Rail Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Mumbai-Ahmedabad High Speed Rail Project” is an infrastructure initiative in the Mass Transit sector, located in India. Taiyo aggregates data on it from The Indian Express.

Participants

Not available for this record.

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Mumbai-Ahmedabad High Speed Rail (MAHSR) project involves the construction of a bullet train line between Mumbai and Ahmedabad. The first 50-km section (Surat-Bilimora) will be operational with an India-made bullet train set (B28) designed for speeds up to 280 kmph. The project includes deployment of the European Train Control System (ETCS) Level 2-based signalling system, scheduled to be operational by August 2027. Japan will provide E10 series trains in the early 2030s, but initial operations will start with Indian high-speed trains.

Original sector

Transportation

Location

Country

India

Source

Source

The Indian Express

URL

More Details

Record type

Project

Sector

Mass Transit, Rail, Government

Article published date

2026-07-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project