logo

Mumbai Metro Line 3

Sector: Mass Transit • Location: Mumbai, Maharashtra, India

Source: Housing

Project
Partially Operational

Mumbai Metro Line 3, also known as the Aqua Line, is a 33.5 km long completely underground metro line connecting Cuffe Parade in South Mumbai to SEEPZ and Aarey in North Mumbai with 26 underground stations and one at-grade station. The total construction cost is around Rs 33,405 crore funded by Japan International Cooperation Agency (JICA). Phase 1 from Aarey JVLR to Bandra Kurla Complex (BKC) is

Status
Under Construction
Sector
Mass Transit, Rail, Government
Location
Mumbai, Maharashtra, India
Updated
22 Jul 2026
Source
Housing

ConstructChat

Ask ConstructChat about Mumbai Metro Line 3

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Mumbai Metro Line 3” is an infrastructure initiative in the Mass Transit sector, located in Mumbai, Maharashtra, India. Taiyo aggregates data on it from Housing.

Participants

Sponsoring Agency

Status

Original status

partially operational

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Mumbai Metro Line 3, also known as the Aqua Line, is a 33.5 km long completely underground metro line connecting Cuffe Parade in South Mumbai to SEEPZ and Aarey in North Mumbai with 26 underground stations and one at-grade station. The total construction cost is around Rs 33,405 crore funded by Japan International Cooperation Agency (JICA). Phase 1 from Aarey JVLR to Bandra Kurla Complex (BKC) is operational since 2024-10-07. Phase 2 from BKC to Acharya Atre Chowk, Worli started operations on 2025-05-09. Phase 3 from Worli to Colaba expected to open by July 2025.

Original sector

Transportation

Budget

Location

Country

India

State

Maharashtra

City

Mumbai

Source

Source

Housing

URL

More Details

Record type

Project

Sector

Mass Transit, Rail, Government

Article published date

2025-05-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project