logo

Mumbai-Pune Expressway Missing Link Project

Sector: Bridge • Location: Mumbai and Pune, Maharashtra, India

Source: The Economic Times

Project
Operational

The Mumbai-Pune Expressway Missing Link Project is a Rs 6,695-crore infrastructure initiative aimed at easing congestion and improving safety on one of India's busiest highways. The project includes a new 13.3-km alignment between the Khopoli exit and Kusgaon, which shortens the expressway by 6 km and reduces travel time by 20-25 minutes. It features 10.55 km of tunnels, including an 8.87-km tunne

Project Information FAQ

Project Information

4 Q
The project “Mumbai-Pune Expressway Missing Link Project” is an infrastructure initiative in the Bridge sector, located in Mumbai and Pune, Maharashtra, India. Taiyo aggregates data on it from The Economic Times.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

operational

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Mumbai-Pune Expressway Missing Link Project is a Rs 6,695-crore infrastructure initiative aimed at easing congestion and improving safety on one of India's busiest highways. The project includes a new 13.3-km alignment between the Khopoli exit and Kusgaon, which shortens the expressway by 6 km and reduces travel time by 20-25 minutes. It features 10.55 km of tunnels, including an 8.87-km tunnel and one of the world's widest road tunnels at 23.5 metres, as well as two major viaducts, including a 184-metre-high cable-stayed bridge. The project was conceived to eliminate a major bottleneck in the Khopoli-Lonavala ghat section where the six-lane Mumbai-Pune Expressway and the four-lane NH-4 currently share the same alignment.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data