logo

Mumbai Trans Harbour Link, Mumbai, India

Sector: Bridge • Location: India

Source: Road Traffic Technology

Project
Closed

The Mumbai Trans Harbour Link will begin at Sewri in South Mumbai and Nhava Sheva in Navi Mumbai. Credit: MMRDA. The Japan International Co-operation Agency (JICA) will fund 85% of the project cost. Credit: MMRDA. The new bridge will improve connectivity and reduce travel time between the two urban areas in Mumbai Metropolitan Region. Credit: MMRDA. The Mumbai Trans Harbour Link (MTHL) is a 22km-l

Project Information FAQ

Project Information

5 Q
The project “Mumbai Trans Harbour Link, Mumbai, India” is an infrastructure initiative in the Bridge sector, located in India. Taiyo aggregates data on it from Road Traffic Technology.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Mumbai Trans Harbour Link will begin at Sewri in South Mumbai and Nhava Sheva in Navi Mumbai. Credit: MMRDA. The Japan International Co-operation Agency (JICA) will fund 85% of the project cost. Credit: MMRDA. The new bridge will improve connectivity and reduce travel time between the two urban areas in Mumbai Metropolitan Region. Credit: MMRDA. The Mumbai Trans Harbour Link (MTHL) is a 22km-long sea bridge being developed over the Mumbai Harbour in the Mumbai Metropolitan Region (MMR), Maharashtra, India. When completed, the MTHL will become the longest sea link in India. The Mumbai Metropolitan Region Development Authority (MMRDA) is developing the bridge, which will connect central Mumbai and Navi Mumbai, a planned township located on the opposite shore of the city. The MTHL project will provide a critical link between the two urban areas and quick access to the southern part of Navi Mumbai. It will also foster the growth and socio-economic development of the mainland and its surrounding areas. The Foundation stone for the MTHL project was laid in December 2014, marking the beginning of the bridge construction, while completion is scheduled for 2021-2022. Home to more than 12 million people, the MMR region is heavily congested and overcrowded. With an increase in the number of people migrating to the city every year, residents and commuters in the city have been facing severe problems including housing shortages, lack of open spaces and civic amenities, and overloaded road and rail transportation infrastructure. Most parts of the city have reached a saturation point, with its peculiar geography imposing constraints for further expansion. The only location which will allow expansion is Navi Mumbai, which has already seen development in its northern half. The southern part of the area still has scope for development, offering 2,500ha of open land. Better connectivity between Mumbai and the mainland is essential to promote both urban and industrial development in the southern part. The Airoli and Vashi bridges are currently the two road links that connect Mumbai and Navi Mumbai. The bridges, however, are expected to reach saturation and will not support future traffic growth. The new link has, therefore, become a necessity to meet the traffic growth. It will reduce the distance and travel time between the two areas and help in the development of the rest of Navi Mumbai. A comprehensive transportation study conducted by MMRDA suggested that MTHL would be an efficient solution to address accommodation and traffic problems in Mumbai. The MTHL will be a six-lane (three on each side) expressway bridge across Mumbai Bay. Of the total length, approximately 17km will be over the sea and 5km will be viaducts on land on either side. The bridge will start at Sewri in Mumbai and end at the Chirle area in Raigad Division. A three-level interchange is planned at Sewri, where the Eastern Freeway and the Sewri-Worli East-West connector will connect with MTHL. The MTHL will feature approach sections, interchanges, intelligence transport system (ITS) and the other amenities required for a marine bridge. The traffic conditions on the stretch will be monitored and managed from the traffic control centre with the help of CCTV cameras and related facilities installed on the stretch. Variable message signs (VMS) will also be installed to display appropriate information for the bridge users. The bridge will be equipped with noise barriers near the Sewri mud flat area and view barriers at BARC to fulfil environmental criteria. The project will be constructed in three sections. The first section includes the construction of the 10.38km-long bridge section across the Mumbai Bay and Sewri interchange, while the second includes the building of the 7.8km-long bridge section across the Mumbai Bay and Shivaji Nagar interchange. The third section includes the construction of the 3.61km-long viaduct, including interchanges at State Highway-54 and at National Highway-4B near Chilre, Navi Mumbai. The estimated investment for the sea bridge project is Rs178.43bn ($2.76bn), 85% of which will be funded by the Japan International Co-operation Agency (JICA). In March 2017, JICA released the first tranche of Rs79.1bn ($1.22bn), which is approximately 45% of the total project cost. Further, the Indian Ministry of Finance sanctioned Rs19.2bn ($297m) for the project. The MMRDA selected the consortium comprising AECOM, Dar Al-Handasah, and T.Y.Lin International as general consultants for the project. The consortium is responsible for helping the development authority in organising pre-bidding meetings, scrutinising bid documents, securing permissions from the government, examining concept designs, project monitoring, and ensuring the quality of work. All the studies related to the project and bid process management were handled by the consortium of Arup, CES and KPMG. The project will be implemented on an engineering, procurement and construction (EPC-Design-Build) basis in three packages. The MMRDA has shortlisted 29 contractors, including seven each for the first two packages and 15 for the third package, following the invitation for pre-qualification from prospective bidders.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data