Mumbai Trans Harbour Link
Closed · Maharashtra
Source: India Investment Grid (IIG)
Information Mumbai Metropolitan Region Development Authority [MMRDA] - MH has come up with Mumbai Trans Harbour Link with a ticket size of 17843 INR Crores. This project in Roads & Bridges sub-sector involves The Project's physical progress is 99.50 percentage. The balance of 0.50 physical work includes the minor works such as connectivity as 4 Ramps at Shivajinagar connecting Coastal Road, 1 up
- Status
- Closed
- Sector
- Bridge, Residential, Seaport, Road, Government, Tunnel
- Location
- Mumbai, Maharashtra, India
- Updated
- 22 Jul 2026
- Source
- India Investment Grid (IIG)
ConstructChat
Ask ConstructChat about Mumbai Trans Harbour Link
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Information Mumbai Metropolitan Region Development Authority [MMRDA] - MH has come up with Mumbai Trans Harbour Link with a ticket size of 17843 INR Crores. This project in Roads & Bridges sub-sector involves The Project's physical progress is 99.50 percentage. The balance of 0.50 physical work includes the minor works such as connectivity as 4 Ramps at Shivajinagar connecting Coastal Road, 1 up ramp at Jasai connecting NH-348, Food malls & wayside facilities, removal for temporary bridges demobilisation access, etc. However, connectivity of 1 up & down ramp at Shivajinagar, down ramp at Jasai and complete connectivity at Chirle interchange has been established for the bridge to be operational. The project is inaugurated with the auspicious hands of Hon'ble Prime Minister Shri Narendra Modiji on 12.01.2024 and the Atal Setu is opened for Traffic. Economic/Social Impact of the Project The project envisages construction of 22 Km sea link, 3+3 lane road bridge from Sewri on Mumbai side to Chirle on NH4B in Nhava on mainland side. it also includes construction of interchanges at Sewri on Mumbai side and at Shivajinagar & at Chirle on mainland side. The Project's physical progress is 99.50 percentage. The balance of 0.50 physical work includes the minor works such as connectivity as 4 Ramps at Shivajinagar connecting Coastal Road, 1 up ramp at Jasai connecting NH-348, Food malls & wayside facilities, removal for temporary bridges demobilisation access, etc. However, connectivity of 1 up & down ramp at Shivajinagar, down ramp at Jasai and complete connectivity at Chirle interchange has been established for the bridge to be operational. The project is inaugurated with the auspicious hands of Hon'ble Prime Minister Shri Narendra Modiji on 12.01.2024 and the Atal Setu is opened for Traffic. |
Original sector | Roads & Highways |
Procurement method | |
Budget |
Location
Country | India |
State | Maharashtra |
City | Mumbai |
Source
Source | India Investment Grid (IIG) |
URL |
More Details
Record type | Project |
Sector | Bridge, Residential, Seaport, Road, Government, Tunnel |
Article published date | 2024-02-26 |
Research
Free account
View all details