logo
ProjectClosed

Mumbai Urban Transport Project-2A

One of 10,000+ projects Taiyo tracks in India.

Source: World Bank

The objective of the Second Phase (A) of the Mumbai Urban Transport Project (MUTP-2) for India is to improve the passenger carrying capacity, operational efficiency, level of comfort of, and the institutional capacity of entities involved in, the suburban rail system of Mumbai Metropolitan area. There are four components to the project, the first component being Electric Multiple Unit (EMU) rollin

Status
Closed
Sector
Mass Transit, Rail, Power Generation (CCGT), Automotive, Seaport, Telecommunications, Manufacturing (Industrial), Government
Location
India
Updated
22 Jul 2026
Source
World Bank

ConstructChat

Ask ConstructChat about Mumbai Urban Transport Project-2A

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Mumbai Urban Transport Project-2A” is an infrastructure initiative in the Mass Transit sector, located in India. Taiyo aggregates data on it from World Bank.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The objective of the Second Phase (A) of the Mumbai Urban Transport Project (MUTP-2) for India is to improve the passenger carrying capacity, operational efficiency, level of comfort of, and the institutional capacity of entities involved in, the suburban rail system of Mumbai Metropolitan area. There are four components to the project, the first component being Electric Multiple Unit (EMU) rolling stock fleet increase. Under the project 864 additional EMU cars will be procured. This will increase the total fleet to around 3,124 cars. The Bank loan will finance the electrical equipment for the new cars, to be manufactured at Chennai Integral Coach Factory (ICF), while counterpart funds will cover the remaining costs of production. The second component is the conversion of power supply from direct current to alternating current (including Improvements to signals and telecoms). Three sections of the Mumbai Metropolitan Region (MMR) Central Railway network will be converted from 1,500V DC traction to 25KV AC. This activity comprises: (i) modifying overhead catenaries, (ii) installing power sub-stations, along with switching stations (iii) procuring catenary maintenance equipment; and (iv) modifying signal and telecom systems. The third component is the EMU maintenance facilities and stabling lines. New stabling lines will be built to accommodate the additional trains supplied under the project. The existing EMU maintenance depot at Kurla on the Central Railway and the maintenance shed at Virar built under MUTP-1 will accommodate the new stabling lines. No new car maintenance shed or overhaul workshop is planned under MUTP-2A. In total, 73 new stabling lines will be built: 34 (including four extensions from 9-car to 12-car) on the Western Railway and 39 on the Central Railway. They will be fully funded by the government. Finally, the fourth component is the capacity strengthening and technical assistance.

Original sector

FY17 - Transportation

Budget

Location

Country

India

Source

Source

World Bank

URL

More Details

Record type

Project

Sector

Mass Transit, Rail, Power Generation (CCGT), Automotive, Seaport, Telecommunications, Manufacturing (Industrial), Government

Article published date

2025-12-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project