logo

Mumbai Urban Transport Project-2A

Sector: Mass Transit • Location: India

Source: World Bank Group

Project
Closed

The objective of the Second Phase (A) of the Mumbai Urban Transport Project (MUTP-2) for India is to improve the passenger carrying capacity, operational efficiency, level of comfort of, and the institutional capacity of entities involved in, the suburban rail system of Mumbai Metropolitan area. There are four components to the project, the first component being Electric Multiple Unit (EMU) rollin

Project Information FAQ

Project Information

5 Q
The project “Mumbai Urban Transport Project-2A” is an infrastructure initiative in the Mass Transit sector, located in India. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The objective of the Second Phase (A) of the Mumbai Urban Transport Project (MUTP-2) for India is to improve the passenger carrying capacity, operational efficiency, level of comfort of, and the institutional capacity of entities involved in, the suburban rail system of Mumbai Metropolitan area. There are four components to the project, the first component being Electric Multiple Unit (EMU) rolling stock fleet increase. Under the project 864 additional EMU cars will be procured. This will increase the total fleet to around 3,124 cars. The Bank loan will finance the electrical equipment for the new cars, to be manufactured at Chennai Integral Coach Factory (ICF), while counterpart funds will cover the remaining costs of production. The second component is the conversion of power supply from direct current to alternating current (including Improvements to signals and telecoms). Three sections of the Mumbai Metropolitan Region (MMR) Central Railway network will be converted from 1,500V DC traction to 25KV AC. This activity comprises: (i) modifying overhead catenaries, (ii) installing power sub-stations, along with switching stations (iii) procuring catenary maintenance equipment; and (iv) modifying signal and telecom systems. The third component is the EMU maintenance facilities and stabling lines. New stabling lines will be built to accommodate the additional trains supplied under the project. The existing EMU maintenance depot at Kurla on the Central Railway and the maintenance shed at Virar built under MUTP-1 will accommodate the new stabling lines. No new car maintenance shed or overhaul workshop is planned under MUTP-2A. In total, 73 new stabling lines will be built: 34 (including four extensions from 9-car to 12-car) on the Western Railway and 39 on the Central Railway. They will be fully funded by the government. Finally, the fourth component is the capacity strengthening and technical assistance.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data