logo

Mumbai Water Supply Tunnel Connection and Maintenance Works

One of 10,000+ projects Taiyo tracks in Maharashtra.

Source: LatestLY

Project
Planned

The Brihanmumbai Municipal Corporation (BMC) is undertaking critical water tunnel connection and related maintenance works under its Water Supply Project. The project involves commissioning a water tunnel from Amar Mahal (Hedgewar Udyan) to Wadala (Pratiksha Nagar), Paral (AMT-1), Trombay Reservoir (AMT-2), and Turbhe High Level Reservoir. It includes connecting an 1800 mm diameter water channel s

Status
Prospective
Sector
Water Supply and Storage, Government, Tunnel
Location
Mumbai, Maharashtra, India
Updated
22 Jul 2026
Source
LatestLY

ConstructChat

Ask ConstructChat about Mumbai Water Supply Tunnel Connection and Maintenance Works

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Mumbai Water Supply Tunnel Connection and Maintenance Works” is an infrastructure initiative in the Water Supply and Storage sector, located in Mumbai, Maharashtra, India. Taiyo aggregates data on it from LatestLY.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Brihanmumbai Municipal Corporation (BMC) is undertaking critical water tunnel connection and related maintenance works under its Water Supply Project. The project involves commissioning a water tunnel from Amar Mahal (Hedgewar Udyan) to Wadala (Pratiksha Nagar), Paral (AMT-1), Trombay Reservoir (AMT-2), and Turbhe High Level Reservoir. It includes connecting an 1800 mm diameter water channel supplying the Turbhe High Level Reservoir to another 1800 mm line, along with supplementary works.

Original sector

Water Supply

Location

Country

India

State

Maharashtra

City

Mumbai

Source

Source

LatestLY

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Government, Tunnel

Article published date

2026-05-03

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project