logo
ProjectUnder Construction

Mumbai–Ahmedabad Bullet Train Project

Under construction · Gujarat · Last reported Nov 2025

Source: Free Press Journal

The Mumbai–Ahmedabad Bullet Train Project is a high-speed rail corridor spanning approximately 508 km, designed to reduce travel time between Mumbai and Ahmedabad to nearly two hours. The project features advanced engineering techniques with about 85% of the route on viaducts to minimize land disturbance and enhance safety. The first phase covers the Surat–Bilimora section, scheduled to open in De

Status
Under Construction
Sector
Government, Road, Rail
Location
Surat, Gujarat, India
Updated
22 Jul 2026
Source
Free Press Journal

ConstructChat

Ask ConstructChat about Mumbai–Ahmedabad Bullet Train Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Mumbai–Ahmedabad Bullet Train Project” is an infrastructure initiative in the Government sector, located in Surat, Gujarat, India. Taiyo aggregates data on it from Free Press Journal.

Participants

Sponsoring Agency

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Mumbai–Ahmedabad Bullet Train Project is a high-speed rail corridor spanning approximately 508 km, designed to reduce travel time between Mumbai and Ahmedabad to nearly two hours. The project features advanced engineering techniques with about 85% of the route on viaducts to minimize land disturbance and enhance safety. The first phase covers the Surat–Bilimora section, scheduled to open in December 2027, with services extending to Thane by 2028 and full completion by 2029, linking to Mumbai's Bandra Kurla Complex (BKC).

Original sector

Transport

Location

Country

India

State

Gujarat

City

Surat

Source

Source

Free Press Journal

URL

More Details

Record type

Project

Sector

Government, Road, Rail

Article published date

2025-11-19

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project