logo

Mumbai–Ahmedabad Bullet Train Project

Sector: Rail • Location: Surat, Bilimora, Vapi, Vadodara, Ahmedabad, Gujarat, Maharashtra, India

Source: Swarajyamag

Project
Under Construction

India's first high-speed rail corridor between Mumbai and Ahmedabad is progressing with the adoption of an advanced ballastless track system inspired by Japan's Shinkansen technology. The project deploys the J-Slab track system, replacing traditional ballast tracks with a rigid concrete structure, comprising reinforced concrete track bed, cement asphalt mortar, pre-cast track slabs, and rails with

Project Information FAQ

Project Information

3 Q
The project “Mumbai–Ahmedabad Bullet Train Project” is an infrastructure initiative in the Rail sector, located in Surat, Bilimora, Vapi, Vadodara, Ahmedabad, Gujarat, Maharashtra, India. Taiyo aggregates data on it from Swarajyamag.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

under construction

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

India's first high-speed rail corridor between Mumbai and Ahmedabad is progressing with the adoption of an advanced ballastless track system inspired by Japan's Shinkansen technology. The project deploys the J-Slab track system, replacing traditional ballast tracks with a rigid concrete structure, comprising reinforced concrete track bed, cement asphalt mortar, pre-cast track slabs, and rails with specialised fasteners. Dedicated track slab manufacturing facilities have been set up in Gujarat at Kim near Surat and in Anand, with ten operational track construction bases along the corridor. Around 185 route km of reinforced concrete track bed have been laid, with 188 km of track slab production and over 70 km of installation work completed.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data