logo

Mumbai–Ahmedabad Bullet Train Project

Sector: Bridge • Location: Mumbai, Ahmedabad, Surat, Vapi, Thane, Virar, Boisar, Bilimora, Bharuch, Vadodara, Anand, Sabarmati, Maharashtra, Gujarat, India

Source: Swarajyamag

Project
Under Construction

The Mumbai–Ahmedabad High-Speed Rail (Bullet Train) project is a 508 km high-speed rail corridor connecting Mumbai and Ahmedabad. The project includes construction of viaducts, piers, river and steel bridges, electrification with overhead equipment masts, reinforced concrete track bed laying, and installation of noise barriers. The project is being executed with technical and financial assistance

Project Information FAQ

Project Information

5 Q
The project “Mumbai–Ahmedabad Bullet Train Project” is an infrastructure initiative in the Bridge sector, located in Mumbai, Ahmedabad, Surat, Vapi, Thane, Virar, Boisar, Bilimora, Bharuch, Vadodara, Anand, Sabarmati, Maharashtra, Gujarat, India. Taiyo aggregates data on it from Swarajyamag.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

under construction

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Mumbai–Ahmedabad High-Speed Rail (Bullet Train) project is a 508 km high-speed rail corridor connecting Mumbai and Ahmedabad. The project includes construction of viaducts, piers, river and steel bridges, electrification with overhead equipment masts, reinforced concrete track bed laying, and installation of noise barriers. The project is being executed with technical and financial assistance from the Government of Japan and is expected to be fully operational by 2029, with an inaugural 100-km run between Surat and Vapi planned for August 2027.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data