logo
ProjectCompleted

Mumbai's 1st Cable-Stayed Bridge

Sector: Road • Location: Mumbai, Maharashtra, India

Source: Free Press Journal

The bridge, valued at Rs 145 crore, stretches 385 metres and is strategically designed to alleviate traffic congestion in the area. It includes two down ramps and a 1.52-kilometre stretch, specifically constructed to improve traffic flow and ensure enhanced safety for commuters.

Status
Closed
Sector
Road, Bridge, Rail
Location
Mumbai, Maharashtra, India
Updated
22 Jul 2026
Source
Free Press Journal

ConstructChat

Ask ConstructChat about Mumbai's 1st Cable-Stayed Bridge

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Mumbai's 1st Cable-Stayed Bridge” is an infrastructure initiative in the Road sector, located in Mumbai, Maharashtra, India. Taiyo aggregates data on it from Free Press Journal.

Participants

Not available for this record.

Status

Original status

Completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The bridge, valued at Rs 145 crore, stretches 385 metres and is strategically designed to alleviate traffic congestion in the area. It includes two down ramps and a 1.52-kilometre stretch, specifically constructed to improve traffic flow and ensure enhanced safety for commuters.

Budget

Location

Country

India

State

Maharashtra

City

Mumbai

Source

Source

Free Press Journal

URL

More Details

Record type

Project

Sector

Road, Bridge, Rail

Article published date

2025-01-29

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project