Munger Road Bridges 1005 & 2001
Sector: Bridge • Location: Boise, Idaho, United States of America
Source: Dodge
In accordance with the plans and specifications, this work shall consist of Replacing two culvert bridges with a box culverts, headwalls, wing walls, and riprap. Also includes curb, gutter, and sidewalk, pedestrian ramps, roadway reconstruction, valley gutters, irrigation pipe, expanding a stormwater drainage basin, and sewer and water line work.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | In accordance with the plans and specifications, this work shall consist of Replacing two culvert bridges with a box culverts, headwalls, wing walls, and riprap. Also includes curb, gutter, and sidewalk, pedestrian ramps, roadway reconstruction, valley gutters, irrigation pipe, expanding a stormwater drainage basin, and sewer and water line work. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
