logo

Muni Trolley Coach Upgrade and Expansion

Sector: Automotive • Location: San Francisco, California, United States of America

Source: SFMTA Projects

Project
Current

Muni Trolley Coach Upgrade and Expansion Share this: Facebook Twitter LinkedIn Project Timeline Summer 2016 Construction: Summer 2016 - Winter 2020 Pending Current Phase or Stage Construction Predicted Completion Winter 2020 Project Status Current Improvements Improve service with newer and more reliable trolley coaches Bus Routes and Rail Lines 1 California 3 Jackson (Suspended) 5 Fulton 5R Fulto

Project Information FAQ

Project Information

4 Q
The project “Muni Trolley Coach Upgrade and Expansion” is an infrastructure initiative in the Automotive sector, located in San Francisco, California, United States of America. Taiyo aggregates data on it from SFMTA Projects.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

current

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Muni Trolley Coach Upgrade and Expansion Share this: Facebook Twitter LinkedIn Project Timeline Summer 2016 Construction: Summer 2016 - Winter 2020 Pending Current Phase or Stage Construction Predicted Completion Winter 2020 Project Status Current Improvements Improve service with newer and more reliable trolley coaches Bus Routes and Rail Lines 1 California 3 Jackson (Suspended) 5 Fulton 5R Fulton Rapid 6 Haight/Parnassus 14 Mission 21 Hayes 22 Fillmore 24 Divisadero 30 Stockton 31 Balboa 33 Ashbury/18th Street 41 Union (Suspended) 45 Union/Stockton The Plan Between 2016 and 2020 the SFMTA will procure 278 New Flyer trolley coaches to replace and expand our all-electric trolley coach fleet. To date, our trolley coaches are the only coaches that can successfully navigate San Francisco’s difficult topography. For example, these remarkable vehicles can climb a 23% grade with a fully-loaded bus. The SFMTA’s next-generation trolley coaches contain state-of-the-art technology and support technological advances. The coaches slated for replacement have reached the end of their scheduled useful life. Replacing these vehicles will save time and money spent on maintenance and allow the SFMTA to dedicate more resources to serving our passengers. Expanding the trolley coach fleet will increase our trolley coach service and help us meet growing current and future ridership demand. The bigger and better trolley coach fleet will not only be more reliable, but also safer, and more comfortable for our operators and passengers. Technological Upgrades 1. Service improvement features Preventative and predictive maintenance system Incline Mode to prevent vehicle damage when traversing uneven terrain 2. Safety improvement features State-of-the-art braking system Better performance on high-grades Off-wire capabilities that allow the coaches to run solely on battery power for an extended period Brighter, more reliable interior lighting. 3. Ridership experience improvement features Perimeter seat layout with more standing room Low floor chassis, instead of door steps, for easier boarding and alighting Environmental Benefits For almost 85 years Muni has continuously operated a network of vehicles, including trolley coaches, that run on 100% greenhouse gas-free Hetch Hetchy hydroelectric power. Our legacy, or pre-replacement, all-electric trolley coach fleet helped the City meet its 2017 San Francisco Climate Action Strategy goals. Upgrading and expanding this fleet will help the City meet future environmental goals by increasing trolley coach service and growing ridership on the greenest transportation system in North America. Additionally, upgrading and expanding the trolley coach fleet is in line with the City’s voter-approved Transit-First Policy established in 1973. The policy prioritizes public transit, bicycling, and walking on SF Streets as an economically and environmentally preferable alternative to transportation by individual automobiles. By providing safe, reliable, rapid, and environmentally sustainable transit service, this project will support our city’s economic and population growth while reducing greenhouse gas emissions and resource consumption. Contact Information Bhavin Khatri Bhavin.Khatri@sfmta.com 415.646.2586

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data