Municipal Float Construction
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The project includes all materials, labor and workmanship to construct and deliver (5) floats for the Town of Bar Harbor for the Town Landing. The work is divided into 5 floats, each 8 x24 with minor variances to each based on their location. The floats contain a dingy tie rail on the inboard side. Chain rigging and moorings for the floats will be provided by others and are not part of the bid. Al
- Status
- Closed
- Sector
- Forest Products and Packaging, Rail, Seaport, Government, Commercial, Manufacturing (Industrial)
- Location
- Bar Harbor, Maine, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Municipal Float Construction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project includes all materials, labor and workmanship to construct and deliver (5) floats for the Town of Bar Harbor for the Town Landing. The work is divided into 5 floats, each 8 x24 with minor variances to each based on their location. The floats contain a dingy tie rail on the inboard side. Chain rigging and moorings for the floats will be provided by others and are not part of the bid. All bolts and threaded rod shall be galvanized. The design includes all pressure treated lumber of ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Maine |
City | Bar Harbor |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Forest Products and Packaging, Rail, Seaport, Government, Commercial, Manufacturing (Industrial) |
Article published date | 2024-04-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Forest Products and Packaging projects in United States of America
- REMOVE TILE ROOF & INSTALL OSB & (N) 30 LB FELT PAPER & NEW CONCRETE TILES (9 LB/SF), COLOR: APPALATIAN BLEND
- CS 560/PINE STREET IN LUMBER CITY - TIA
- RENWICK STREET FROM W RAILROAD STREET TO JONES STREET - TIA
- Paper Work
- 2501 Garden Highway Garage
- CR 473/SWAMP ROAD @ GUM SWAMP
- CR 265/PAPER MILL RD FM CR 244/SPRING LAKE TO CS 967/EZZARD
- Cooperative Agreement for Odometer Fraud Investigations
