logo

Municipal Infrastructure IV Programme (investment m.)

Sector: Government • Location: Albania

Source: KFW Bank aus Verantwortung

Project
Active

The FC module objective of the Municipal Infrastructure IV program is to ensure a reliable and hygienically safe drinking water supply for the population in selected program cities in Albania at cost-covering and socially acceptable prices and to guarantee acceptable settlement hygiene through proper wastewater disposal - with increased performance/cost coverage of the utility companies. The Munic

Project Information FAQ

Project Information

5 Q
The project “Municipal Infrastructure IV Programme (investment m.)” is an infrastructure initiative in the Government sector, located in Albania. Taiyo aggregates data on it from KFW Bank aus Verantwortung.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The FC module objective of the Municipal Infrastructure IV program is to ensure a reliable and hygienically safe drinking water supply for the population in selected program cities in Albania at cost-covering and socially acceptable prices and to guarantee acceptable settlement hygiene through proper wastewater disposal - with increased performance/cost coverage of the utility companies. The Municipal Infrastructure IV program builds on the established structures and implementation approach of the predecessor programs Municipal Infrastructure I-III (Kom I-III) and includes elements of conceptual further development. Program IV is aimed at the water supply and wastewater disposal companies at the project locations Delvina, Gjirokastra and Lushnja as well as the water department of the Kamza city administration as the project executing agency (PEA) and the Ministry of Energy and Infrastructure as the program executing agency (Programme Coordination Unit, PCU). In addition to three locations that were already part of Kom I-II, a new location is now being added: Delvina. The core element of the program concept for Municipal Infrastructure I - IV is an incentive mechanism for cost coverage for utility companies by linking performance improvements and investment measures (so-called performance-based approach). The program is implemented after the individual cost coverage targets have been achieved at the individual locations (milestone concept). Kom IV is implemented in a 2-phase model. As part of a program preparation phase (phase 1), the project locations are supported by international consultants in preparing technical feasibility studies and improving their organization and performance. In the implementation phase (phase 2), the investments are implemented with consultant support.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data