logo

Municipal Services Project

Sector: Water Supply and Storage • Location: Turkey

Source: World Bank Group

Project
Closed

The Municipal Services Project is aligned with the Country assistance Strategy (CAS) fourth development theme, since it will support environmental improvements at the municipal level. Specifically, the CAS mentions that the project will help improve services, which will be achieved through the proposed investments, and institutional strengthening components of the project. The project will have th

Project Information FAQ

Project Information

5 Q
The project “Municipal Services Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Turkey. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Municipal Services Project is aligned with the Country assistance Strategy (CAS) fourth development theme, since it will support environmental improvements at the municipal level. Specifically, the CAS mentions that the project will help improve services, which will be achieved through the proposed investments, and institutional strengthening components of the project. The project will have three components as follows. The Municipal Development component - under eligible expenditures, will finance activities on the water, wastewater, and solid waste sectors. Investments have been proposed by the Iller Bank (IB), and, the Policy and Human Resources Development Fund (PHRD) grant is financing feasibility studies in a number of municipalities to confirm the viability of the investments. The project implementation arrangements outline Sub-borrower, and Sub-project eligibility criteria, while IB will appraise each Sub-project, and will be responsible for supervision. The second component - Municipal Technical Assistance - will support: a) feasibility studies; b) urban planning; c) preparation of design and bidding documents; d) the Operational Improvement Plan related to institutional, technical, financial, and environmental matters. All Sub-projects will have an Operational Improvement Plan; and, e) construction supervision. These activities will be financed through Sub-loan proceeds from IB. The third component - Iller Bank Institutional Strengthening - will include technical assistance to IB for the implementation of the project, and the Action Plan in a satisfactory manner. These expenditures will be financed from IB's own resources, and the loan proceeds. The component will increase the financial and banking capacity, and increase as well the technical capacity. Auditing and incremental operating costs will be financed under this component.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data