logo

Municipality of Grand Lake - Chipman Wastewater Treatment System Replacement

Sector: Water Supply and Storage • Location: New Brunswick, Canada

Source: Infrastructure Canada

Project
Pre-Construction

This project involves replacing an existing wastewater treatment facility (WwTF, 45+ years old) with a fully new treatment facility, including a new outfall pipe. The new WwTF will be sized with a design average flow capacity of approximately 930 m3/d (and up to 1 550 m3/d under 30-day sustained high flow conditions). This design flow is based on an estimated existing residential population of 1 2

Project Information FAQ

Project Information

5 Q
The project “Municipality of Grand Lake - Chipman Wastewater Treatment System Replacement” is an infrastructure initiative in the Water Supply and Storage sector, located in New Brunswick, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

pre-construction

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This project involves replacing an existing wastewater treatment facility (WwTF, 45+ years old) with a fully new treatment facility, including a new outfall pipe. The new WwTF will be sized with a design average flow capacity of approximately 930 m3/d (and up to 1 550 m3/d under 30-day sustained high flow conditions). This design flow is based on an estimated existing residential population of 1 200 people, an anticipated future population growth of up to 650 people, and existing domestic flows generated from commercial, institutional and industrial sources estimated at an equivalent of 600 people. Note: The WwTF will not be designed to accommodate industrial-type wastewater sources. The proposed treatment process is based on aerated lagoon and low-temperature nitrification treatment technologies generally consisting of the following components: raw wastewater (influent) pumping station, aerated lagoons, nitrification process, UV disinfection, treated effluent pumping station, outfall pipeline, other amenities (raw wastewater grinding/fine-screening, odour control, emergency stand-by power, control buidling, SCADA communications), and bio-solds handling/disposal. The existing WwTF will be decommissioned. The existing oxidation ditch process component will be re-furbished for dewatered waste bio-solids disposal. The new UV disinfection process (2020/2021) will be incorporated into the upgraded wastewater treatment process train.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data