logo

Municipality of the District of Guysborough - Solar Energy for Facilities

Sector: Water Supply and Storage • Location: Nova Scotia, Canada

Source: Infrastructure Canada

Project
In Progress

The Municipality of the District of Guysborough has proposed to install solar photovoltaic (PV) systems, totaling 335 kW AC, to supply renewable electricity to several of their facilities. Nine net-metered systems will be installed, including two libraries, two recreation centres, the main municipal office, three waste management buildings, and their water treatment plant. Electricity savings from

Project Information FAQ

Project Information

3 Q
The project “Municipality of the District of Guysborough - Solar Energy for Facilities” is an infrastructure initiative in the Water Supply and Storage sector, located in Nova Scotia, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

in progress

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Municipality of the District of Guysborough has proposed to install solar photovoltaic (PV) systems, totaling 335 kW AC, to supply renewable electricity to several of their facilities. Nine net-metered systems will be installed, including two libraries, two recreation centres, the main municipal office, three waste management buildings, and their water treatment plant. Electricity savings from projects will be put back into local recreation and performance facilities/programs. Key Benefits: - Lifetime GHG reductions: 5,600 tonnes - On average, solar energy will supply 50 percent of total electricity load at the proposed facilities. - Job creation: 7 jobs (during construction) Project Breakdown: - Canso Library: 14.4 kW AC/19 kW DC - Guysborough Library: 8.4 kW AC/11 kW DC - Chedabucto Lifestyle Complex: 100 kW AC/133 kW DC - Canso & Area Arena: 100 kW AC/133 kW DC - Municipal Office: 14.4 kW AC/19 kW DC - Waste Management Administration: 11.4 kW AC/14 kW DC - Waste Management Maintenance: 28.8 kW AC/35 kW DC - Recycling Depot: 28.8 kW AC/38 kW DC - Water Treatment Plant: 28.8 kW AC/36 kW DC

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data