Municipality of the District of Guysborough - Solar Energy for Facilities
Sector: Stadium • Location: Nova Scotia, Canada
Source: Infrastructure Canada
The Municipality of the District of Guysborough has proposed to install solar photovoltaic (PV) systems, totaling 335 kW AC, to supply renewable electricity to several of their facilities. Nine net-metered systems will be installed, including two libraries, two recreation centres, the main municipal office, three waste management buildings, and their water treatment plant. Electricity savings from
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | in progress |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Municipality of the District of Guysborough has proposed to install solar photovoltaic (PV) systems, totaling 335 kW AC, to supply renewable electricity to several of their facilities. Nine net-metered systems will be installed, including two libraries, two recreation centres, the main municipal office, three waste management buildings, and their water treatment plant. Electricity savings from projects will be put back into local recreation and performance facilities/programs. Key Benefits: - Lifetime GHG reductions: 5,600 tonnes - On average, solar energy will supply 50 percent of total electricity load at the proposed facilities. - Job creation: 7 jobs (during construction) Project Breakdown: - Canso Library: 14.4 kW AC/19 kW DC - Guysborough Library: 8.4 kW AC/11 kW DC - Chedabucto Lifestyle Complex: 100 kW AC/133 kW DC - Canso & Area Arena: 100 kW AC/133 kW DC - Municipal Office: 14.4 kW AC/19 kW DC - Waste Management Administration: 11.4 kW AC/14 kW DC - Waste Management Maintenance: 28.8 kW AC/35 kW DC - Recycling Depot: 28.8 kW AC/38 kW DC - Water Treatment Plant: 28.8 kW AC/36 kW DC |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
