MuniGuate URP
One of 2,534 projects Taiyo tracks in Guatemala.
Source: IFC Project Disclosures
The investment involves an unfunded risk participation (URP) of 75% for a loan (the Covered Loan) to the Municipality of Guatemala City (MGC) with a maturity date before January 14, 2028, and up to GTQ [280] million (approx. US$ [35] million equivalent). The Covered Loan is provided by Banco Industrial.The investment follows IFC’s upstream engagement under the LAC Cities Platform that started in O
- Status
- Prospective
- Sector
- Water Supply and Storage, Government
- Location
- Guatemala
- Updated
- 19 Nov 2026
- Source
- IFC Project Disclosures
ConstructChat
Ask ConstructChat about MuniGuate URP
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | pending |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The investment involves an unfunded risk participation (URP) of 75% for a loan (the Covered Loan) to the Municipality of Guatemala City (MGC) with a maturity date before January 14, 2028, and up to GTQ [280] million (approx. US$ [35] million equivalent). The Covered Loan is provided by Banco Industrial.The investment follows IFC’s upstream engagement under the LAC Cities Platform that started in October 2022. It will address the city’s infrastructure bottlenecks by funding capital expenditures in (1) water infrastructure, such as small greenfield water treatment plants (“WTP”, to be used as pretreatment to existing facilities), as well as the rehabilitation and expansion of an existing groundwater extraction system managed by the municipal water company EMPAGUA to optimize the use of surface water and reducing losses of the groundwater system; (2) modernizing the city’s traffic light system through the installation of smart traffic lights and associated software and infrastructure upgrades to the existing control center, managed by the MGC’s Regulatory Entity for Transportation and Traffic - EMETRA and (3) assessing the feasibility of installing urban cycling routes and the deployment of a public bicycle system, managed by the Department of Urban Mobility, Planning Management of the MGC (together, the Project). The use of IFC proceeds will focus on projects with limited-to-medium environmental and social (E&S) risk that can be implemented within 2 years of commitment.EMPAGUA’s infrastructure will receive IFC’s proceeds to build two pretreatment facilities to enhance the surface water quality at the inlet of existing WTPs, and rehabilitate an existing groundwater extraction facility to improve energy efficiency and control water losses due to leakages or seepage. These assets aim at optimizing the use of surface water and reducing losses of the groundwater system.In parallel, IFC supported MGC with a new advisory package under the LAC Cities Platform. |
Original sector | W-BF - Municipal Finance - Multiple Sectors [Project only] |
Location
Country | Guatemala |
Source
Source | IFC Project Disclosures |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government |
Article published date | 2026-09-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
