Active

The Brazilian government, under the power regulator Aneel, awarded a greenfield build, own, and operate contract for a transmission line in Brazil’s Bahia state. The project company, Muhirah Transmissora de Energia SA, will transmit power through the concessional period of 30 years. The 106 km line will connect Camacari and Sapeacu (both in Bahia state). The project was one of seven transmission c

Status
Prospective
Sector
Power Generation (CCGT), Government, Commercial
Location
Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Munirah Transmissora de Energia SA

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Munirah Transmissora de Energia SA” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Brazilian government, under the power regulator Aneel, awarded a greenfield build, own, and operate contract for a transmission line in Brazil’s Bahia state. The project company, Muhirah Transmissora de Energia SA, will transmit power through the concessional period of 30 years. The 106 km line will connect Camacari and Sapeacu (both in Bahia state). The project was one of seven transmission concessions awarded by Aneel in 2003-2004; all lines cover 1,787 km and will include investments of US$614 million. Aneel was prompted to release the bids after Brazil’s National Privatization Council (CND) issued a resolution in June 2003 calling for seven groups of transmission concessions. The greenfield build, own, and operate contract was awarded by Aneel in late 2003 and signed the concessional agreement in October 2004. The contract was signed by the winning consortium comprising ACS subsidiary Control y Montajes Industriales (Cymi – 95 percent) and Brazilian firm Fluxo Energaria Limitada (5 percent). The consortium was selected on the basis of offering the lowest transmission tariff. Total project financing of US$38 million was provided by the sponsors in October 2004 with the support of BNDES. The project commenced operations by mid-2005.

Original sector

Energy

Procurement method

Budget

Location

Country

Brazil

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Government, Commercial

Article published date

2024-09-19

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project