Munirah Transmissora de Energia SA
Sector: Government • Location: Brazil
Source: World Bank Group
The Brazilian government, under the power regulator Aneel, awarded a greenfield build, own, and operate contract for a transmission line in Brazil’s Bahia state. The project company, Muhirah Transmissora de Energia SA, will transmit power through the concessional period of 30 years. The 106 km line will connect Camacari and Sapeacu (both in Bahia state). The project was one of seven transmission c
- Status
- Prospective
- Sector
- Government, Power Generation (CCGT), Commercial
- Location
- Brazil
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Munirah Transmissora de Energia SA
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Brazilian government, under the power regulator Aneel, awarded a greenfield build, own, and operate contract for a transmission line in Brazil’s Bahia state. The project company, Muhirah Transmissora de Energia SA, will transmit power through the concessional period of 30 years. The 106 km line will connect Camacari and Sapeacu (both in Bahia state). The project was one of seven transmission concessions awarded by Aneel in 2003-2004; all lines cover 1,787 km and will include investments of US$614 million. Aneel was prompted to release the bids after Brazil’s National Privatization Council (CND) issued a resolution in June 2003 calling for seven groups of transmission concessions. The greenfield build, own, and operate contract was awarded by Aneel in late 2003 and signed the concessional agreement in October 2004. The contract was signed by the winning consortium comprising ACS subsidiary Control y Montajes Industriales (Cymi – 95 percent) and Brazilian firm Fluxo Energaria Limitada (5 percent). The consortium was selected on the basis of offering the lowest transmission tariff. Total project financing of US$38 million was provided by the sponsors in October 2004 with the support of BNDES. The project commenced operations by mid-2005. |
Original sector | Energy |
Procurement method | |
Budget |
Location
Country | Brazil |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Government, Power Generation (CCGT), Commercial |
Article published date | 2024-09-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Government projects in Brazil
- Belo Monte Hydroelectric Power Plant Xingu River
- Jirau Hydroelectric Power Plant Rondnia
- Uruguaiana CCGT Power Plant Brazil
- GNA I LNGtoPower Project Rio de Janeiro Brazil
- Juba-Jauru-Maggi-Nova Mutum Transmission Line
- Potiguar Sul Transmissao de Energia
- ERB Candeias Thermal Power Plant
- Sol do Futuro Solar PV Plant
