Muntanga Uranium Project Heap Leach Operation
Sector: Nuclear • Location: Zambia
Source: Crux Investor
The Muntanga uranium project in Zambia is a heap leach operation with excellent recoveries and low acid consumption, supported by a 2025 Feasibility Study showing a net present value of $243 million and an internal rate of return of 20.8%. The project avoids greenfield mill construction, offering capital efficiency.
- Status
- Prospective
- Sector
- Nuclear
- Location
- Zambia
- Updated
- 22 Jul 2026
- Source
- Crux Investor
ConstructChat
Ask ConstructChat about Muntanga Uranium Project Heap Leach Operation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | feasibility study completed |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Muntanga uranium project in Zambia is a heap leach operation with excellent recoveries and low acid consumption, supported by a 2025 Feasibility Study showing a net present value of $243 million and an internal rate of return of 20.8%. The project avoids greenfield mill construction, offering capital efficiency. |
Original sector | Mining |
Budget |
Location
Country | Zambia |
Source
Source | Crux Investor |
URL |
More Details
Record type | Project |
Sector | Nuclear |
Article published date | 2026-03-31 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
