Murdock Diversion Radial Gate Refurbishment
Closed · Utah · Last reported Dec 2024
Source: Dodge USA
The Work is generally described as follows: Murdock Diversion Radial Gate Refurbishment Work of the Project includes the refurbishment of the radial gate used to divert water from Provo River to the Provo River Aqueduct at the Murdock Diversion Structure. Refurbishment includes recoating the radial gate and reconstruction of the pillow block structure used to connect the radial gate to the wall.
- Status
- Closed
- Sector
- Water Supply and Storage, Commercial, Manufacturing (Industrial)
- Location
- Orem, Utah, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Murdock Diversion Radial Gate Refurbishment
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Work is generally described as follows: Murdock Diversion Radial Gate Refurbishment Work of the Project includes the refurbishment of the radial gate used to divert water from Provo River to the Provo River Aqueduct at the Murdock Diversion Structure. Refurbishment includes recoating the radial gate and reconstruction of the pillow block structure used to connect the radial gate to the wall. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Utah |
City | Orem |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Manufacturing (Industrial) |
Article published date | 2024-12-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
