Murphy (TX) Walmart Supercenter 2973.1007 SUP-SP 2025
Sector: Raw Materials • Location: Murphy, Texas, United States of America
Source: Dodge
Demolition Of Existing Surfaces For The Installation Of Ev Chargers Grading Of Surfaces Associated With Evse To Comply With Ada Requirements (1) Utility Transformer To Be Coordinated With Oncor Energy (1) 3000 Amp Switchboard Assembly (4) Alpitronic Ev Chargers (2) Future Ev Charger Stubs
- Status
- Closed
- Sector
- Raw Materials, Electric Vehicles (EVs), Power Transmission, Power Generation (CCGT), Commercial, Automotive, Manufacturing (Industrial)
- Location
- Murphy, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Murphy (TX) Walmart Supercenter 2973.1007 SUP-SP 2025
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | notice of completion |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Demolition Of Existing Surfaces For The Installation Of Ev Chargers Grading Of Surfaces Associated With Evse To Comply With Ada Requirements (1) Utility Transformer To Be Coordinated With Oncor Energy (1) 3000 Amp Switchboard Assembly (4) Alpitronic Ev Chargers (2) Future Ev Charger Stubs |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Murphy |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Raw Materials, Electric Vehicles (EVs), Power Transmission, Power Generation (CCGT), Commercial, Automotive, Manufacturing (Industrial) |
Article published date | 2025-07-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Raw Materials projects in United States of America
- SR 138@CR 55/NUNNALLY FARM RD RT TURN LN
- JUSTIN and J. LOHR Center for Wine and Viticulture
- William and Linda Frost Center for Research and Innovation
- ROOFTOP SOLAR PV INSTALL. (8) 400W MODULES AT 3.2 KW TOTAL. INSTALL (1) (N) ESS TELSA POWERWALL BATTERY AT 13.5 KWH.
- LIVESTOCK AMENDMENTS
- CUP AND MSPR FOR NEW INDUSTRIAL CAMPUS WITH 2 SHELL BUILDING (232,653 AND 154,618 SF) AT FORMER BERKELEY FARMS SITE
- VINYL-LINER SWIMMING POOL LOCATED IN REAR YARD
- Dwight D. Eisenhower Memorial
