Murphy's Bridge Replacement
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The work involves the replacement of an existing wood bridge with a new prefabricated steel girder bridge. The work includes removal of the existing bridge (provisional), temporary creek diversion, construction of new abutments, installation of a prefabricated bridge supplied by the Owner, reconstruction of roadway approaches and other miscellaneous work. The location of the work is Wabi Pit Line
- Status
- Prospective
- Sector
- Bridge, Steel, Government, Road, Metal, Commercial
- Location
- New Liskeard, Ontario, Canada
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Murphy's Bridge Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The work involves the replacement of an existing wood bridge with a new prefabricated steel girder bridge. The work includes removal of the existing bridge (provisional), temporary creek diversion, construction of new abutments, installation of a prefabricated bridge supplied by the Owner, reconstruction of roadway approaches and other miscellaneous work. The location of the work is Wabi Pit Line in the Township of Kerns in the District of Timiskaming. |
Procurement method |
Location
Country | Canada |
State | Ontario |
City | New Liskeard |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Bridge, Steel, Government, Road, Metal, Commercial |
Article published date | 2024-02-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Bridge projects in Canada
- Aqsarniit Hotel and Convention Centre
- Toronto Airport Piers D and E Fixed Bridges
- British Columbia Swartz Bay and Tsawwassen Ferry Terminals
- Viva Magnetics Plant
- Sheffield Bridge Tri-Municipal Project
- Nisichawayasihk Cree Nation (NCN) Road Paving Project Phase 2
- Rosenort Industrial Park Road Extension
- Paving of Oak River Roads
