Murray Avenue Street Reconstruction
Sector: Water Supply and Storage • Location: Worthington, Minnesota, United States of America
Source: Dodge
Approximate Major Quantities: 1000 Lf Remove Sanitary Sewer 2275 Lf Remove Curb And Gutter 4325 Sy Remove Bituminous Pavement 450 Sy Remove 6" Conc Pavement With 1.5" Bituminous 2530 Lf 4" Perf Pe Pipe Drain (Subgrade Installation) 7300 Sf 4" Concrete Walk 2275 Lf Concrete Curb And Gutter B624 1000 Lf 4" Pvc Sanitary Service (Sdr 35) If Bituminous Pavement: 1200 Cy Drainage Aggregate Base, Type Ds
- Status
- Closed
- Sector
- Water Supply and Storage, Road, Government, Waste Processing and Treatment, Cement, Commercial
- Location
- Worthington, Minnesota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Murray Avenue Street Reconstruction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Approximate Major Quantities: 1000 Lf Remove Sanitary Sewer 2275 Lf Remove Curb And Gutter 4325 Sy Remove Bituminous Pavement 450 Sy Remove 6" Conc Pavement With 1.5" Bituminous 2530 Lf 4" Perf Pe Pipe Drain (Subgrade Installation) 7300 Sf 4" Concrete Walk 2275 Lf Concrete Curb And Gutter B624 1000 Lf 4" Pvc Sanitary Service (Sdr 35) If Bituminous Pavement: 1200 Cy Drainage Aggregate Base, Type Dsb (Cv) 800 Ton Type Sp 12.5 Wear Coarse Mixture (2, B) 120 Sy 7" Concrete Pavement If Concrete Pa... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Minnesota |
City | Worthington |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Government, Waste Processing and Treatment, Cement, Commercial |
Article published date | 2025-03-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
