Murray County Courthouse Renovation
One of 10,000+ projects Taiyo tracks in Oklahoma.
Source: Dodge USA
The project consists of a renovation of the Courthouse, 1001 W. Wyandotte Ave, Sulphur, OK. The building is two (2) story is of approximately 5,400 s.f. per level with a 350 s.f. basement and will require interior demolition, new metal stud walls, ceilings, finishes, windows, HVAC, electrical, plumbing and new roof
- Status
- Closed
- Sector
- Power Generation (CCGT), Commercial, Manufacturing (Industrial), Government, Metal
- Location
- Sulphur, Oklahoma, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Murray County Courthouse Renovation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | sub bidding, construction documents |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project consists of a renovation of the Courthouse, 1001 W. Wyandotte Ave, Sulphur, OK. The building is two (2) story is of approximately 5,400 s.f. per level with a 350 s.f. basement and will require interior demolition, new metal stud walls, ceilings, finishes, windows, HVAC, electrical, plumbing and new roof |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Oklahoma |
City | Sulphur |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Commercial, Manufacturing (Industrial), Government, Metal |
Article published date | 2024-12-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- VALDOSTA - AIRFIELD ELECTRICAL IMPROVEMENTS
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
