Murtala Muhammed Terminal Two

The status, timeline and source of this project. A free account opens every field.

Source: World Bank Group

On 23 May 2002 the Nigerian government, through aviation minister Kema Chike, awarded a Build, Own and Transfer (BOT) contract for terminal one at the Murtala Muhammed terminal to local company Stabilini Vision Limited (SVL). The BOT was necessary to replace the old terminal building at the airport, which was destroyed by fire in March 2000. In October 2001 a first attempt at rebuilding the termin

Status
Failure
Sector
Aerospace & Defense, Commercial, Forest Products and Packaging, Government, Airport
Location
Nigeria
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Murtala Muhammed Terminal Two

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Murtala Muhammed Terminal Two” is an infrastructure initiative in the Aerospace & Defense sector, located in Nigeria. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Distressed

Taiyo status

Failure

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

On 23 May 2002 the Nigerian government, through aviation minister Kema Chike, awarded a Build, Own and Transfer (BOT) contract for terminal one at the Murtala Muhammed terminal to local company Stabilini Vision Limited (SVL). The BOT was necessary to replace the old terminal building at the airport, which was destroyed by fire in March 2000. In October 2001 a first attempt at rebuilding the terminal was made with a 10 year BOT contract was awarded to Nigerian-Canadian consortium Royal Sanderton Ventures. On 24 April 2003 a concession agreement was signed between the Nigerian Government and the Federal Airports Authority on one side and Stabilini Visinon Litd (as sponsor) and Bi-Courtney Ltd (as concessionaire) from the other side. The BOT concession was originally signed for 12 years with construction taking 18 months. Following a supplementary agreement the construction period was extended to 33 months. Bi-Courtney Aviation Services Limited (BASL) was established to manage the MMA2 terminal. The estimated cost of the project was $200 million. The project was partionally financed with a loan of $150 million from a consortium of 6 banks —Oceanic Bank International Plc, Zenith Bank Plc, GT Bank Plc, First Bank Plc, First City Monument Bank Plc and Access Bank Plc. Debt to equity ratio is 60:40. As per the agreement, the Bi-Courtney should pay a concession fee in the amount of 5% of the annual turnover. On 7 April 2007, the terminal was inaugurated by the then president of Nigeria Olusegun Obasanjo and flight operations began on 7 May 2007. On 25 August 2017 Bi-Courtney obtained ministerial approval for extension of the contract for 36 years, which is being contested by the Federal Airports Authority of Nigeria (FAAN). http://niqs.org.ng/wp-content/uploads/2017/07/PAPER-1-NIQS-WORKSHOP-JULY-2017-APPENDIX-I-CASE-STUDIES.pdf https://www.mma2.com.ng/corporate-information/our-history/ http://ppp.icrc.gov.ng/project/128) debt:equity ratio taken from http://ppp.icrc.gov.ng/project/128)

Original sector

Transport

Procurement method

Budget

Location

Country

Nigeria

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Aerospace & Defense, Commercial, Forest Products and Packaging, Government, Airport

Article published date

2024-06-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project