Musanze Hydropower Plant
Sector: Hydro • Location: Rwanda
Source: World Bank Group
The project includes the development of the Musanze hydropower plant, located in Rwanda. The plant is being constructed on Mukungwa River in Nkotsi Sector in two phases; Rwaza I to produce 2.6 megawatts, and Rwaza II, the second phase will start later along the same river to add one megawatt to the national grid.
DC HydroPower (Rwanda) identified and developed the project through the feasibility
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The project includes the development of the Musanze hydropower plant, located in Rwanda. The plant is being constructed on Mukungwa River in Nkotsi Sector in two phases; Rwaza I to produce 2.6 megawatts, and Rwaza II, the second phase will start later along the same river to add one megawatt to the national grid. DC HydroPower (Rwanda) identified and developed the project through the feasibility stage and signing of the Power purchase Agreement (PPA) with the Rwanda Energy Group. Funding is coming from several international sources, including Germany's KfW development bank, Denmark's Frontier Energy and sub-Saharan investment group responsAbility Renewable Energy Holding (rAREH). The United States also provided financial and technical assistance via its Power Africa initiative. Germany injected $6 million while the US was more involved in feasibility studies. http://www.newtimes.co.rw/section/read/214781/ http://www.energycentral.com/news/rwanda-musanze-hydro-power-project-add-36mw-grid http://www.hydroworld.com/articles/2017/06/officials-break-ground-on-rwanda-s-3-6-mw-musanze-small-hydropower-project.html |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
