logo

Musanze Hydropower Plant

Sector: Hydro • Location: Rwanda

Source: World Bank Group

Project
Active

The project includes the development of the Musanze hydropower plant, located in Rwanda. The plant is being constructed on Mukungwa River in Nkotsi Sector in two phases; Rwaza I to produce 2.6 megawatts, and Rwaza II, the second phase will start later along the same river to add one megawatt to the national grid.

DC HydroPower (Rwanda) identified and developed the project through the feasibility

Status
Prospective
Sector
Hydro, Power Generation (CCGT), Government
Location
Rwanda
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Musanze Hydropower Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Musanze Hydropower Plant” is an infrastructure initiative in the Hydro sector, located in Rwanda. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project includes the development of the Musanze hydropower plant, located in Rwanda. The plant is being constructed on Mukungwa River in Nkotsi Sector in two phases; Rwaza I to produce 2.6 megawatts, and Rwaza II, the second phase will start later along the same river to add one megawatt to the national grid. DC HydroPower (Rwanda) identified and developed the project through the feasibility stage and signing of the Power purchase Agreement (PPA) with the Rwanda Energy Group. Funding is coming from several international sources, including Germany's KfW development bank, Denmark's Frontier Energy and sub-Saharan investment group responsAbility Renewable Energy Holding (rAREH). The United States also provided financial and technical assistance via its Power Africa initiative. Germany injected $6 million while the US was more involved in feasibility studies. http://www.newtimes.co.rw/section/read/214781/ http://www.energycentral.com/news/rwanda-musanze-hydro-power-project-add-36mw-grid http://www.hydroworld.com/articles/2017/06/officials-break-ground-on-rwanda-s-3-6-mw-musanze-small-hydropower-project.html

Original sector

Energy

Budget

Location

Country

Rwanda

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Hydro, Power Generation (CCGT), Government

Article published date

2024-09-19

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project