Musanze hydropower PPP project
Project in construction · Rwanda
Source: InfraPPPWorld
The Musanze hydropower PPP plant will be developed in two phases, The Rwaza I and II.When completed the combined output will be of about 3.6 MW. The project will be located on the Mukungwa River, Nkotsi Sector and is expected to connect more than 100,000 households to the grid.The Rwaza I will comprise a ‘run-of-river’ hydropower scheme, the installed capacity for the plant will be of 2.6 MW. The
- Status
- Under Construction
- Sector
- Hydro
- Location
- Rwanda
- Updated
- 22 Jul 2026
- Source
- InfraPPPWorld
ConstructChat
Ask ConstructChat about Musanze hydropower PPP project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | project in construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Musanze hydropower PPP plant will be developed in two phases, The Rwaza I and II.When completed the combined output will be of about 3.6 MW. The project will be located on the Mukungwa River, Nkotsi Sector and is expected to connect more than 100,000 households to the grid.The Rwaza I will comprise a ‘run-of-river’ hydropower scheme, the installed capacity for the plant will be of 2.6 MW. The project is expected to divert 12m³ per second of flow from the Mukungwa River into a channel for approximately 1400m until it reaches forebay. It will be located in the northern province of Rwanda.The Rwaza II also involves a ‘run-of-river’ hydropower scheme, the installed capacity for the plant will be of 1.0 MW. This phase will divert 14m³ per second of flow from the Mukungwa River directly into penstock, running along the right bank of the river for approximately 500m. It will be located in the northern province of Rwanda. |
Original sector | Energy |
Procurement method | |
Budget |
Location
Country | Rwanda |
Source
Source | InfraPPPWorld |
URL |
More Details
Record type | Project |
Sector | Hydro |
Article published date | 2025-02-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Hydro projects in Rwanda
- Musanze Hydropower Plant
- Rwanda Mountain Tea Giciye SHPP
- Electrogaz
- Rwanda - Muvumba Multipurpose Water Resources Development Program
- Rwanda - Skills development in the energy sector (FAPA-Technical Assistance)
- RWANDA - Rwanda Energy Sector Results Based Financing (RBF II)
- Renewable Energy Potential in Africa
- Rw: Sustainable Energy Development Project (GEF)
