Musanze hydropower PPP project
Sector: Hydro • Location: Rwanda
Source: InfraPPPWorld
The Musanze hydropower PPP plant will be developed in two phases, The Rwaza I and II. When completed the combined output will be of about 3.6 MW. The project will be located on the Mukungwa River, Nkotsi Sector and is expected to connect more than 100,000 households to the grid. The Rwaza I will comprise a ‘run-of-river’ hydropower scheme, the installed capacity for the plant will be of 2.6 MW. T
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | project in construction |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Musanze hydropower PPP plant will be developed in two phases, The Rwaza I and II. When completed the combined output will be of about 3.6 MW. The project will be located on the Mukungwa River, Nkotsi Sector and is expected to connect more than 100,000 households to the grid. The Rwaza I will comprise a ‘run-of-river’ hydropower scheme, the installed capacity for the plant will be of 2.6 MW. The project is expected to divert 12m³ per second of flow from the Mukungwa River into a channel for approximately 1400m until it reaches forebay. It will be located in the northern province of Rwanda. The Rwaza II also involves a ‘run-of-river’ hydropower scheme, the installed capacity for the plant will be of 1.0 MW. This phase will divert 14m³ per second of flow from the Mukungwa River directly into penstock, running along the right bank of the river for approximately 500m. It will be located in the northern province of Rwanda. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | Low |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Hydro projects in Rwanda
- Musanze Hydropower Plant
- Rwanda Mountain Tea Giciye SHPP
- Electrogaz
- Rwanda - Muvumba Multipurpose Water Resources Development Program
- Rwanda - Skills development in the energy sector (FAPA-Technical Assistance)
- RWANDA - Rwanda Energy Sector Results Based Financing (RBF II)
- Musanze hydropower PPP project
- Renewable Energy Potential in Africa
