Museum Arnhem / Benthem Crouwel Architects
Closed · Last reported Oct 2023
Source: ArchDaily
In addition to the special floating wing, a wide public staircase was added connecting the new volume with the renewed sculpture garden. Another eye-catcher is the façade. The new wing is tiled with 82,000 unique, hand-crafted tiles. The special color gradient of the tiles on the façade – from earthy tones on the streetside to icy blue on the side facing the river – symbolizes the museum's locatio
- Status
- Closed
- Sector
- Bridge, Residential, Commercial
- Updated
- 22 Jul 2026
- Source
- ArchDaily
ConstructChat
Ask ConstructChat about Museum Arnhem / Benthem Crouwel Architects
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In addition to the special floating wing, a wide public staircase was added connecting the new volume with the renewed sculpture garden. Another eye-catcher is the façade. The new wing is tiled with 82,000 unique, hand-crafted tiles. The special color gradient of the tiles on the façade – from earthy tones on the streetside to icy blue on the side facing the river – symbolizes the museum's location on the moraine created by a glacier. Through the combination of the natural colours and shape the building blends in with the surroundings.Text description provided by the architects.Benthem Crouwel Architects designed the plan for the new MuseumArnhemat a prominent location on a green moraine in the city of Arnhem, The Netherlands. The monumental building from 1873 underwent a spectacular renovation: the characteristic historic dome was restored and a unique new extension of more than 1,100 m2 of exhibition space has been created, added to the existing 1,350 m2 in the monument, resulting in a total of 1,935 ‘state-of-the-art’ exhibition spaces. A special feature is the new wing, which protrudes 15 meters over the moraine, making visitors feel like they are hovering above the trees.The municipality ofArnhemwanted to put Museum Arnhem back on the map and give it a new, fresh look without damaging or interfering with the surroundings and with respect for the monument. Benthem Crouwel Architects’ clear and simple design concept involved restoring Cornelis Outshoorn’s 1873 design in all its former glory.This extension mechanism by means of jacks is a technique known from bridge construction, which had not been used in building construction before. After a first extension of 11.4 meters, the second part of the structure was added as a counterweight, after which the whole was moved another 4.8 meters.The building was transformed into a visible, well-organized, and accessible new museum that connects the city with nature and art. Due to its unique location, we chose to have the new elongated building volume partially float above the moraine. In this way, the distinctive location of the museum is optimally used and emphasized. In order to realize the 15-meter cantilever without damage to its monumental surroundings, a spectacular construction method was used: the rectangular extension was partly built up on-site, after which it was slid over the moraine via a sliding track. |
Location
| Not available for this record. |
Source
Source | ArchDaily |
URL |
More Details
Record type | Project |
Sector | Bridge, Residential, Commercial |
Article published date | 2025-06-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Bridge projects
- Auburn Avenue Historic and Cultural Information Project
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- I-95 NB @ ST MARYS RIVER - BRIDGE REHAB
- CR 111/ CAIN CREEK RD--CULVERT & APPR @ CROOKED CREEK TRIB
- JOINT REHABILITATION PROJECT ON 12 BRIDGES IN DIST 5|511440
- SR 112 BRIDGE OVER BOLLINGER CREEK| IMPROVE CR 77 FOR DETOUR
- CR 243/BROOKS ROAD @ ALCOVY RIVER
- I-185 @ SR 116; MOUNTAIN OAK CREEK & HOPEWELL CHURCH RD
