Museum Building (Alteration)
Planning schematics · New York · Last reported Jan 2025
Source: Dodge
REMOVAL OF PORTIONS OF EXISITNG ROOFING AND ROOF SLAB TO FACILITATE INSTALLATION OF NEW ELEVATOR BULKHEAD, NEW GENERATOR AND PLATFORM. NEW OVERHEAD DOOR AT LOADING DOCK. PROPOSED CHANGE OF USE FROM ZUG 3 TO ZUG 6.
- Status
- Prospective
- Sector
- Commercial, Manufacturing (Industrial)
- Location
- New York, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Museum Building (Alteration)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | REMOVAL OF PORTIONS OF EXISITNG ROOFING AND ROOF SLAB TO FACILITATE INSTALLATION OF NEW ELEVATOR BULKHEAD, NEW GENERATOR AND PLATFORM. NEW OVERHEAD DOOR AT LOADING DOCK. PROPOSED CHANGE OF USE FROM ZUG 3 TO ZUG 6. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New York |
City | New York |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Commercial, Manufacturing (Industrial) |
Article published date | 2025-01-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
