Museum of the Moving Image Energy Efficiency Upgrades
Completed · New York · Last reported Apr 2026
Source: NYC.gov
A major energy efficiency project at the Museum of the Moving Image involving a $2.7 million chiller replacement, removal of old heating tanks and boiler plant, and installation of an air-source heat pump. This project is part of over $7.5 million invested in critical infrastructure work over five years to improve HVAC, lighting, and control systems, reduce energy costs, and lower emissions.
- Status
- Closed
- Sector
- Commercial
- Location
- New York, United States of America
- Updated
- 22 Jul 2026
- Source
- NYC.gov
ConstructChat
Ask ConstructChat about Museum of the Moving Image Energy Efficiency Upgrades
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A major energy efficiency project at the Museum of the Moving Image involving a $2.7 million chiller replacement, removal of old heating tanks and boiler plant, and installation of an air-source heat pump. This project is part of over $7.5 million invested in critical infrastructure work over five years to improve HVAC, lighting, and control systems, reduce energy costs, and lower emissions. |
Original sector | Energy Efficiency |
Budget |
Location
Country | United States of America (USA) |
State | New York |
City | New York |
Source
Source | NYC.gov |
URL |
More Details
Record type | Project |
Sector | Commercial |
Article published date | 2026-04-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
