Music Academy Staufen / Bez+Kock Architekten
Sector: Wind • Location: Germany
Source: ArchDaily
Text description provided by the architects.The site of the Music Academy of the Federation of German Wind Music Associations is located in an industrial estate on the north-western outskirts ofStaufen im Breisgau. The new building responds to its faceless surroundings with a powerful architectural appearance. The building, clad homogeneously with water-struck clinker brick, defines a new, identit
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Text description provided by the architects.The site of the Music Academy of the Federation of German Wind Music Associations is located in an industrial estate on the north-western outskirts ofStaufen im Breisgau. The new building responds to its faceless surroundings with a powerful architectural appearance. The building, clad homogeneously with water-struck clinker brick, defines a new, identity-creating address. A connecting foyer opens up the striking square new building in a north-south direction.The first floor houses the large concert and rehearsal halls, the dining room and the administration. A single-flight staircase leads to the second floor, where the smaller rehearsal rooms are arranged around the two-story hall. Two centrally located bar and lounge areas are the communicative meeting point of the building.The two upper floors have a total of 60 single and double rooms for guests of the music academy. The functional principle of stacking the functional areas is also expressed in the sculpturally designed clinker brick façade: while the very public first floor with its large trapezoidal windows aims to create the impression of an inviting cultural building, the smaller rehearsal rooms on the second floor are concealed behind a surrounding, strictly timed row of windows. The two residential floors have perforated windows assigned to each room, providing the residents with the necessary privacy. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
