Music City Loop
Sector: Airport • Location: Nashville, Tennessee, United States
Source: WSMV
The Boring Company is building a 10-mile underground transit loop connecting Nashville International Airport (BNA) to downtown Nashville. The project uses electric vehicles in an engineered underground loop to transport passengers, aiming to reduce traffic congestion and boost innovation. It is 100% privately funded.
- Status
- Prospective
- Sector
- Airport, Electric Vehicles (EVs), Automotive, Tunnel, Commercial
- Location
- Nashville, Tennessee, United States of America
- Updated
- 22 Jul 2026
- Source
- WSMV
ConstructChat
Ask ConstructChat about Music City Loop
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Boring Company is building a 10-mile underground transit loop connecting Nashville International Airport (BNA) to downtown Nashville. The project uses electric vehicles in an engineered underground loop to transport passengers, aiming to reduce traffic congestion and boost innovation. It is 100% privately funded. |
Original sector | Transportation |
Location
Country | United States of America (USA) |
State | Tennessee |
City | Nashville |
Source
Source | WSMV |
URL |
More Details
Record type | Project |
Sector | Airport, Electric Vehicles (EVs), Automotive, Tunnel, Commercial |
Article published date | 2025-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
