Musselman HS football field Turf & Track Improvements
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The work in general consists of converting Musselman HS football field from natural grass to synthetic turf and resurfacing the track. THE RENOVATION OF THE EXISTING NATURAL GRASS FOOTBALL FIELD TO ARTIFICIAL TURF. WORK INCLUDES, BUT NOT LIMITED TO, THE INSTALLATION OF DYNAMIC DRAINAGE SYSTEM, STORM DRAIN INSTALLATION, ARTIFICIAL TURF INSTALLATION, SITE WORK, MINOR GRADING, REMOVAL AND RE INSTALLA
- Status
- Closed
- Sector
- Water Supply and Storage, Car parking, Waste Processing and Treatment, Automotive, Government, Commercial
- Location
- Inwood, West Virginia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Musselman HS football field Turf & Track Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work in general consists of converting Musselman HS football field from natural grass to synthetic turf and resurfacing the track. THE RENOVATION OF THE EXISTING NATURAL GRASS FOOTBALL FIELD TO ARTIFICIAL TURF. WORK INCLUDES, BUT NOT LIMITED TO, THE INSTALLATION OF DYNAMIC DRAINAGE SYSTEM, STORM DRAIN INSTALLATION, ARTIFICIAL TURF INSTALLATION, SITE WORK, MINOR GRADING, REMOVAL AND RE INSTALLATION OF TRACK SURFACING, SEDIMENTATION AND EROSION CONTROL AND SOIL STABILIZATION. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | West Virginia |
City | Inwood |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Car parking, Waste Processing and Treatment, Automotive, Government, Commercial |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
