Muswellbrook Solar-Plus-Storage Project
The owner, status and timeline of this project. A free account opens every field.
Source: PV Tech
The Muswellbrook project combines 135MW of solar capacity and 100MW of battery energy storage system (BESS). It covers 482 hectares in the Hunter Central Coast Renewable Energy Zone of New South Wales on land formerly associated with coal mining operations. The project includes construction of 2.4km of new overhead wires to connect to the state electricity grid.
- Status
- Under Construction
- Sector
- Energy Storage, Power Generation (CCGT), Solar
- Location
- Muswellbrook, New South Wales, Australia
- Updated
- 22 Jul 2026
- Source
- PV Tech
ConstructChat
Ask ConstructChat about Muswellbrook Solar-Plus-Storage Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Muswellbrook project combines 135MW of solar capacity and 100MW of battery energy storage system (BESS). It covers 482 hectares in the Hunter Central Coast Renewable Energy Zone of New South Wales on land formerly associated with coal mining operations. The project includes construction of 2.4km of new overhead wires to connect to the state electricity grid. |
Original sector | Power Plants |
Location
Country | Australia |
State | New South Wales |
City | Muswellbrook |
Source
Source | PV Tech |
URL |
More Details
Record type | Project |
Sector | Energy Storage, Power Generation (CCGT), Solar |
Article published date | 2026-05-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
