logo

Mutooroo Copper Project Farm-in and Pre-Feasibility Study

Sector: Metal • Location: South Australia, Australia

Source: The Australian

Project
Planned

Hillgrove Resources has secured the right to earn up to 80% of Havilah’s Mutooroo copper project in South Australia through a staged farm-in. The project involves assessing if Mutooroo copper ore can be mined, crushed, railed, and processed at Hillgrove’s Kanmantoo plant. The pre-feasibility study (PFS) will evaluate logistics, metallurgy, mine design, infrastructure, approvals, workforce, and com

Status
Prospective
Sector
Metal, Warehouse, Raw Materials, Commercial
Location
South Australia, Australia
Updated
22 Jul 2026
Source
The Australian

ConstructChat

Ask ConstructChat about Mutooroo Copper Project Farm-in and Pre-Feasibility Study

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Mutooroo Copper Project Farm-in and Pre-Feasibility Study” is an infrastructure initiative in the Metal sector, located in South Australia, Australia. Taiyo aggregates data on it from The Australian.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Hillgrove Resources has secured the right to earn up to 80% of Havilah’s Mutooroo copper project in South Australia through a staged farm-in. The project involves assessing if Mutooroo copper ore can be mined, crushed, railed, and processed at Hillgrove’s Kanmantoo plant. The pre-feasibility study (PFS) will evaluate logistics, metallurgy, mine design, infrastructure, approvals, workforce, and commercial modeling to determine the feasibility of using existing infrastructure to reduce costs and risks.

Original sector

Mining

Budget

Location

Country

Australia

State

South Australia

Source

Source

The Australian

URL

More Details

Record type

Project

Sector

Metal, Warehouse, Raw Materials, Commercial

Article published date

2026-05-23

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project