Muzaffarnagar - Saharanpur road (SH-59)

Sector: Road • Location: India

Source: World Bank Group

Project
Active

Muzaffarnagar - Saharanpur road (SH-59) project entails the construction and development (four - laning) of a 53 km long stretch in Muzaffarnagar district, Uttar Pradesh. The project will also include one large length bridge, three small length bridges, one truck lay-by and nine bus shelters would also be constructed under the project. Apart from these, a toll plaza would also be built at 8.60 km.

Project Information FAQ

Project Information

4 Q
The project “Muzaffarnagar - Saharanpur road (SH-59)” is an infrastructure initiative in the Road sector, located in India. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Muzaffarnagar - Saharanpur road (SH-59) project entails the construction and development (four - laning) of a 53 km long stretch in Muzaffarnagar district, Uttar Pradesh. The project will also include one large length bridge, three small length bridges, one truck lay-by and nine bus shelters would also be constructed under the project. Apart from these, a toll plaza would also be built at 8.60 km. Deoband Highways Pvt Ltd. is a Special Purpose Vehicle (SPV) promoted by APCO Infratech (74%) and Chetak Enterprises Ltd (26%) to develop, maintain and manage the road project on a DBFOT (toll) basis. The project was awarded, following a competitive bidding auction, by Uttar Pradesh State Highway Authority (UPSHA) based on the least bid for grant from UPSHA. The total cost of the project is $124.88 million (Rs.827.94 crore), funded through equity of $22.9 million (Rs.151.79 crore), grant from UPSHA of $45.43 million (Rs.301.15) crore and term debt of $56.56 million (Rs.375 crore). Financial closure/ appointed date took place on March 31st, 2016. As on December 09, 2016, DHPL has incurred a cost of Rs.317.62 crore towards the project funded through equity of Rs.151.79 crore (including unsecured loans from promoters of Rs.74.37 crore), term debt of Rs.115.53 crore, grant from UPSHA of Rs.17.02 crore and current liabilities of Rs.33.28 crore. As on December 09, 2016, the financial progress was measured at 39.58% and physical progress of the work done on the main carriageway, service road and structures was around 22%.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data