Muzaffarnagar - Saharanpur road (SH-59)

Sector: Automotive • Location: India

Source: World Bank Group

Project
Active

Muzaffarnagar - Saharanpur road (SH-59) project entails the construction and development (four - laning) of a 53 km long stretch in Muzaffarnagar district, Uttar Pradesh. The project will also include one large length bridge, three small length bridges, one truck lay-by and nine bus shelters would also be constructed under the project. Apart from these, a toll plaza would also be built at 8.60 km.

Status
Prospective
Sector
Automotive, Bridge, Residential, Road, Commercial, Government
Location
India
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Muzaffarnagar - Saharanpur road (SH-59)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Muzaffarnagar - Saharanpur road (SH-59)” is an infrastructure initiative in the Automotive sector, located in India. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Muzaffarnagar - Saharanpur road (SH-59) project entails the construction and development (four - laning) of a 53 km long stretch in Muzaffarnagar district, Uttar Pradesh. The project will also include one large length bridge, three small length bridges, one truck lay-by and nine bus shelters would also be constructed under the project. Apart from these, a toll plaza would also be built at 8.60 km. Deoband Highways Pvt Ltd. is a Special Purpose Vehicle (SPV) promoted by APCO Infratech (74%) and Chetak Enterprises Ltd (26%) to develop, maintain and manage the road project on a DBFOT (toll) basis. The project was awarded, following a competitive bidding auction, by Uttar Pradesh State Highway Authority (UPSHA) based on the least bid for grant from UPSHA. The total cost of the project is $124.88 million (Rs.827.94 crore), funded through equity of $22.9 million (Rs.151.79 crore), grant from UPSHA of $45.43 million (Rs.301.15) crore and term debt of $56.56 million (Rs.375 crore). Financial closure/ appointed date took place on March 31st, 2016. As on December 09, 2016, DHPL has incurred a cost of Rs.317.62 crore towards the project funded through equity of Rs.151.79 crore (including unsecured loans from promoters of Rs.74.37 crore), term debt of Rs.115.53 crore, grant from UPSHA of Rs.17.02 crore and current liabilities of Rs.33.28 crore. As on December 09, 2016, the financial progress was measured at 39.58% and physical progress of the work done on the main carriageway, service road and structures was around 22%.

Original sector

Transport

Budget

Location

Country

India

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Automotive, Bridge, Residential, Road, Commercial, Government

Article published date

2024-05-23

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project