logo

Muzizi Hydroelectric Power Station

Sector: Hydro • Location: Uganda

Source: KFW Bank aus Verantwortung

Project
Completed

The project consists of the construction of the Muzizi hydro power plant (44.5 MW) in western Uganda with the objective to improve the supply of the economy and the electricity consumers of Uganda with cost-efficient and environmentally friendly energy from hydro power. Muzizi will be developed as a run-of-river power plant with peaking capacity to provide electricity also during peak demand times

Project Information FAQ

Project Information

4 Q
The project “Muzizi Hydroelectric Power Station” is an infrastructure initiative in the Hydro sector, located in Uganda. Taiyo aggregates data on it from KFW Bank aus Verantwortung.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project consists of the construction of the Muzizi hydro power plant (44.5 MW) in western Uganda with the objective to improve the supply of the economy and the electricity consumers of Uganda with cost-efficient and environmentally friendly energy from hydro power. Muzizi will be developed as a run-of-river power plant with peaking capacity to provide electricity also during peak demand times of the day. The project includes all construction measures, environmental and social mitigation measures as well as expert services to support the implementation and monitoring of the project. Since the project will contribute to an improved electricity supply, the beneficiaries of the project will be all consumers connected to the electricity grid as well as public institutions and businesses. Furthermore, the population not connected to the grid will benefit indirectly since public institutions such as schools and health centers are able to provide better services. Total costs of the project are estimated to be EUR 110 million. KfW and AfD are willing to jointly finance the project with a combination of concessional loans and grant funding. The project shall be financed under the Mutual Reliance Initiative (MRI) with KfW being the lead financier. KfW considers providing an interest subsidized loan of up to EUR 40 million as well as a grant of up to EUR 4 million financed from the ongoing open sector program Promotion of Renewable Energy and Energy Efficiency. AFD considers providing a loan of up to EUR 45 million. The Republic of Uganda is committed to covering the remaining financing gap between the total costs of the project and the funds provided by AFD and KfW. As illustrated in this report, the project yields a significant developmental impact. We therefore propose to fund the project with an interest rate subsidized loan.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data