MV Cargo

Sector: Water Supply and Storage • Location: Ukraine

Source: International Finance Corporation (IFC)

Project
Completed

MV Cargo Ltd (“MV Cargo” or “the company”) is developing a greenfield grain terminal that will be located in the Port of Yuzhny located in Ajalyk Estuary on Ukraine’s Black Sea coast, approximately 30 km from Odessa. The grain terminal will have capacity of 5 million tonnes of grain per year (“the terminal”) and Berth No.25 (the “berth”) will be capable of handling vessels up to 100,000 tonnes dea

Project Information FAQ

Project Information

4 Q
The project “MV Cargo” is an infrastructure initiative in the Water Supply and Storage sector, located in Ukraine. Taiyo aggregates data on it from International Finance Corporation (IFC).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

MV Cargo Ltd (“MV Cargo” or “the company”) is developing a greenfield grain terminal that will be located in the Port of Yuzhny located in Ajalyk Estuary on Ukraine’s Black Sea coast, approximately 30 km from Odessa. The grain terminal will have capacity of 5 million tonnes of grain per year (“the terminal”) and Berth No.25 (the “berth”) will be capable of handling vessels up to 100,000 tonnes deadweight tonnage (DWT). MV Cargo is owned by the co-owners of Trans Investment Service Group (“TIS Group”), the largest Ukrainian port complex. The grain terminal facilities will be developed by MV Cargo and upon completion of the project facilities Cargill Inc., a leading global agriculture commodities producer and trader, is expected to purchase 51% of stake of the company and become a major user and operate the terminal and berth. Following the agreement signed with MV Cargo in March 2016, the Ukrainian Sea Ports Authority (the “Authority”), a state enterprise responsible for supervising development, operation, and maintenance of the Ukrainian seaports and their infrastructure, will support the terminal development by designing, implementing and monitoring the necessary dredging works up to 16 meter depth for the connection of the berth to the inner channel of the Port of Yuzhny. The terminal and the berth will be developed in two phases. IFC’s proposed investment (“the project”) consists of the first phase of the terminal and berth development. The first phase of the terminal development primarily entails construction of: (i) rail intake facilities with a capacity of 4 million tonnes of grain per year (two unloading points for two wagons each); (ii) truck intake facilities (six unloading points for trucks including trailer by means of truck tipplers), (iii) one unloading point suitable for (back) unloading trucks / tipping cars; truck buffer area, (iv) grain storage facilities (14 silos and one flat storage with capacity of 210,000 tonnes, one flat storage with 36,000 tonne capacity for multi-grain storage or 80,000 tonne capacity for single grain storage); (v) a grain cleaning and drying unit with capacity 150 tonnes per hour, (vi) a transport network of elevators and conveyors, (vii) a ship loader for loading of bulk grain on ships with a capacity of 2000 tonnes per hour; and (viii) off-site utilities (power supply, gas supply, potable water supply, sewage collection and pre-treatment, storm water collection, fire water network, security systems, communication networks). The first phase development of the berth will encompass construction of a 422 m berth in length on reclaimed land with one rail-mounted movable ship loader with capacity of 2,000 tonnes per hour and depth of up to 15 meters. The project will be connected to the rail station “Khimicheskaya” located in the Port of Yuzhny and operated by TIS Group. The second phase of the terminal development includes facilities for liquid bulk, additional flat storage and a second ship loader that will increase annual capacity of the facility to 6 – 8 million tonnes of grain. The project will be constructed by direct contracting of services, works and equipment supply and installation. MV Cargo contracted TIS Gidrotekhnika as the project general contractor for the berth and terminal construction in June 2016. To date approximately 300,000 cubic meters of fill material has already been placed as part of required reclamation for the berth. It is expected that the project will become operational within two years from commencement of construction.The project required acquisition of 11 land plots of total acreage of 28.01 ha. The company purchased nine of these land plots from its three private owners at market rates on a willing-buyer, willing-seller basis and two plots were acquired from the State Administration of Odessa region under long-term (49 years) lease agreements signed in March 2010 and September 2011.IFC is considering an A Loan of up to $37 million to finance the project. The European Bank for Reconstruction and Development (“EBRD”) is likely to be involved as a parallel lender providing a parallel loan of the same amount.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data