logo

MW Fuel Cell micro grid and district heating at King’s Cross

Sector: Power Generation (CCGT) • Location: United Kingdom, Germany, Italy

Source: EU Funding & Tenders Portal

Project
Ended

ELECTROU will install the first MW fuel cell in Europe fully integrated into a building at the high profile redevelopment at Kings Cross, London. This includes the full use of power & heat generated by the fuel cell within the local building, the site wide heat, power and cooling networks, and extends to water re-use and support of the micro grid. ELECTROU will prove that the multi-MW installation

Project Information FAQ

Project Information

3 Q
The project “MW Fuel Cell micro grid and district heating at King’s Cross” is an infrastructure initiative in the Power Generation (CCGT) sector, located in United Kingdom, Germany, Italy. Taiyo aggregates data on it from EU Funding & Tenders Portal.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

ended

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

ELECTROU will install the first MW fuel cell in Europe fully integrated into a building at the high profile redevelopment at Kings Cross, London. This includes the full use of power & heat generated by the fuel cell within the local building, the site wide heat, power and cooling networks, and extends to water re-use and support of the micro grid. ELECTROU will prove that the multi-MW installation due to operational efficiency and negligible emissions will massively improve local and EU wide carbon emission targets. Designed to be an outdoor installation the plant will be adapted to indoor requirements e.g. space, ventilation, and safe access and egress. Up-scaling more than 3 times the installed capacity compared to current indoor installations is a critical step for large scale deployment within building applications. The use of fuel cells in this critical sector is currently prevented due to the high spatial requirements of multiple smaller modules, high capital cost compared to other technologies, and complexity of integration. ELECTROU will break all of these barriers. The project will demonstrate to key decision makers, investors and financiers that there is a near term route to produce electricity and heat in a highly efficient way by a technology which is commercially viable today. ELECTROU will prove through funding support that multi-MW installations within buildings can make an investment grade return without the need for any form of local or EU subsidy, this is a critical step in making the sector viable. A targeted dissemination campaign will be performed to share all of the results with stakeholders and the general public that promotes the technical, commercial and environmental benefits of this mature but high tech technology. We will develop one valid process for all fuel cell installations in Europe by supporting the set-up of simplified regulations, codes and standards that as a result will positively influence market entry throughout the EU.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data