Myrtle Beach Renourishment Project
Sector: Road • Location: Myrtle Beach, South Carolina, United States
Source: Post and Courier
Great Lakes Dredge and Dock has been awarded a $72.3 million contract for the Myrtle Beach Renourishment Project, which involves placing dredged material on the shores of Myrtle Beach, Garden City Beach, and Surfside Beach. The project is expected to start in the fourth quarter of 2025 and be completed by early 2026.
- Status
- Prospective
- Sector
- Road
- Location
- Myrtle Beach, South Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Post and Courier
ConstructChat
Ask ConstructChat about Myrtle Beach Renourishment Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Great Lakes Dredge and Dock has been awarded a $72.3 million contract for the Myrtle Beach Renourishment Project, which involves placing dredged material on the shores of Myrtle Beach, Garden City Beach, and Surfside Beach. The project is expected to start in the fourth quarter of 2025 and be completed by early 2026. |
Original sector | Coastal Management |
Budget |
Location
Country | United States of America (USA) |
State | South Carolina |
City | Myrtle Beach |
Source
Source | Post and Courier |
URL |
More Details
Record type | Project |
Sector | Road |
Article published date | 2025-01-30 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
