logo

Mytrah Vayu Nazeerabad Wind Farm

Sector: Government • Location: India

Source: World Bank Group

Project
Active

The project entails the construction and development of a 100 MW wind power plant in Nazeerabad, Rangareddy district in the state of Telangana, by Mytrah Vayu (Godavari) Private Limited. The sponsor is Mytrah Energy which was earlier known as the Caparo Group. Suzlon will install 47 wind turbine generator (WTGs) of the S97 120m Hybrid Tower with rated capacity of 2.1MW each. The project will power

Project Information FAQ

Project Information

5 Q
The project “Mytrah Vayu Nazeerabad Wind Farm” is an infrastructure initiative in the Government sector, located in India. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project entails the construction and development of a 100 MW wind power plant in Nazeerabad, Rangareddy district in the state of Telangana, by Mytrah Vayu (Godavari) Private Limited. The sponsor is Mytrah Energy which was earlier known as the Caparo Group. Suzlon will install 47 wind turbine generator (WTGs) of the S97 120m Hybrid Tower with rated capacity of 2.1MW each. The project will power ~60,000 households and curb ~0.2 million tonnes of CO2 emissions each year. Details on the contract were not available. However, the company website mentions that they secure PPAs of 13-25 year duration for all their projects. The total project cost is USD $ 90.4 million (INR5.95 billion) and is being financed entirely by a 15-year-6-month term loan provided by IDFC Bank. Financial close occurred on 22 September 2015. i) Dealogic ii) http://www.mytrah.com/docs/Half_Year_Report_2015.pdf iii) http://articles.economictimes.indiatimes.com/2015-08-10/news/65415443_1_mytrah-energy-wind-capacity-telangana-government iv) http://www.mytrah.com/about-mytrah-energy-ltd.php v)http://suzlon.com/images/Media_Center_Press_release/362_Press%20release%20Suzlon%20group%20to%20supply%2098MW%20to%20Mytrah%20Energy%2018th%20May%202015.pdf

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data